Home Breaking News Published by DRM of Samastipur Division – – Kosi and Mithilanchal to join Rail Service in March

Published by DRM of Samastipur Division – – Kosi and Mithilanchal to join Rail Service in March

Bihar Supulites will get the gift of railway in March. If all goes well, Pratapganj and Nirmali will be connected by rail service by the end of March. In a conversation with journalists during the inspection, DRM Ashok Maheshwari of Samastipur Railway Division said, He arrived in Supal from Samastipur on Sunday to review the construction work on the Saharsa-Saraiganda and Saraiga-Darbhanga railway blocks by the LG Special Train.

The DRM informed that the work of Aman Parivartan will be completed by March at Furbisganj. After this, trains from Asanpur Kufa to Nirmali and Raghopur to Pratapganj will start operating in the first phase. However, on the question of increasing the number of trains, it said that the number of trains would be increased soon when the rail operations started on Kosi Mahashetu, which was included in the mega project.

He said the trains would be extended after electrification between the Aman Transition and Saharsa-Furbisganj. Currently, deficiencies are being eliminated by checking the safety and passenger facilities for the operation of trains. Prior to this he inspected the platform and checked the passenger facilities. Foot overbridge at the station was asked to put signals at the platform’s entry point so that passengers could easily see it. After this, he saw the urethra at the north end of the station complex.

With them are RPF Commandant Anshuman Tripathi, Sr. DOM Rupesh Kumar, Sr. DST Rahul Kumar, DEM Carentine RN, Senior DEM 3 Mayank Agarwal, Sr. DCM Saraswathi Chandra, DNE Ravir Kumar, IOE.

LEAVE A REPLY

Please enter your comment!
Please enter your name here